Client: | Granite / ADNOC Gas Processing |
---|---|
Location: | Asab |
Year: | 2007 & 2010 |
Type: | MEP |
Scope of Work
- Design, engineering, procurement, construction, installation, and commissioning of electrical network.
- Electrical distribution network – 11kV substation (Total 10 MVA) with 11kV panel from ABB, 3 LV 5000 A panels from Comeca, and 6 transformers, 10kVA UPS.
- Earthing works, including a deep well earth (>60m) and lightning protection works.
- Supply and installation of 11kV switchgear, MCC’s, 3.15MVA transformers, bus ducts, and UPS.
- Modification of existing 11kV feeder.
- New substation design with 11kV SWGR (ABB).
- Transformers (4 nos. 3.15MVA).