Construction (EPC) of new 33/11kV Substation for shifting of 33kV and 11kV loads from existing substation to the new substation.
Supply, installation, testing, and commissioning of 33kV GIS, 11kV AIS and 0.415kV switchgear, 25 MVA, 33/11kV power transformers, and 11/ 0.415kV distribution transformers, modification of existing 33kV GIS Panel and GT-2 synchronization panel, and supply, laying and termination of 33kV, 11kV and LV cables.
11kV RMU, DC UPS and AC UPS; updating DCS System.
Test and commissioning of new PMS / LMS systems / integration with existing temporary power supply arrangement during changeover period.
Civil works, HVAC works, fire alarm and fire fighting system, etc.