Client: | ADNOC Offshore |
---|---|
Location: | Lower Zakum Field, Abu Dhabi |
Year: | 2019 |
Type: | EPC |
Scope of Work
- The Project involved vast Engineering, Procurement, Barge Services along with Site execution till Commissioning and Handover.
- The Scope of work involves replacement of existing Manual Choke/Diverter/ DBB Valves with motor operated valves. Installation of CCTV system and all associated RTU, Telecom, Structural, Electrical Modification works on 21 WHT Platforms. Replacement of existing ESD RTU, SCADA at Super Complex, and integrate all signals from 21 DOF Platforms, and 41 Non DOF Platforms.