EPC Work for Application of Digital Oil Field (DOF) Technology on Brownfield Towers

Client: ADNOC Offshore
Location: Lower Zakum Field, Abu Dhabi
Year: 2019
Type:EPC
Project 43

  Scope of Work

  • The Project involved vast Engineering, Procurement, Barge Services along with Site execution till Commissioning and Handover.
  • The Scope of work involves replacement of existing Manual Choke/Diverter/ DBB Valves with motor operated valves. Installation of CCTV system and all associated RTU, Telecom, Structural, Electrical Modification works on 21 WHT Platforms. Replacement of existing ESD RTU, SCADA at Super Complex, and integrate all signals from 21 DOF Platforms, and 41 Non DOF Platforms.