This project is to extend 33/11 KV, 3*20 MVA EB11PRY1 by 4th 33/11 KV, 20 MVA Transformer, transfer the 33 KV Load from MHWG to WTBGPRY3 Grids and related protection modification works based on ADDC scheme.
Work shall include for site survey, engineering, obtaining the necessary permits from authorities, manufacturing, factory testing, transport, delivery to site, installation, site testing, training, commissioning, necessary civil works and handing over of equipment’s.