Client: | Hyundai / ADNOC LNG |
Location: | Das Island |
Year: | 2012 |
Type: | Construction |
Scope of Work
- E&I construction works for green field and brown field for IGD project:
- Installation, testing, and commissioning of MV/LV switchgears, power and distribution transformers, as well as UPS.
- Installation of 12 km. cable trays.
- Below ground and above ground cabling – 720 km.
- Cable glanding and termination – 14,500 glands.
- Calibration, installation, and pre-commissioning works for field instruments – 1,600 nos.
- Installation and pre-commissioning of IPCMS, PMS/LCS, and DCS/ESD system.
- Lightning and earthing protection.
- Heat tracing and cathodic protection.