Integrated Gas Development (IGD) Project (Green Field & Brown Field)

Client:Hyundai / ADNOC LNG
Location:Das Island
Year:2012
Type:Construction

  Scope of Work

  • E&I construction works for green field and brown field for IGD project:
    • Installation, testing, and commissioning of MV/LV switchgears, power and distribution transformers, as well as UPS.
    • Installation of 12 km. cable trays.
    • Below ground and above ground cabling – 720 km.
    • Cable glanding and termination – 14,500 glands.
    • Calibration, installation, and pre-commissioning works for field instruments – 1,600 nos.
    • Installation and pre-commissioning of IPCMS, PMS/LCS, and DCS/ESD system.
    • Lightning and earthing protection.
    • Heat tracing and cathodic protection.