MEP Works for Habshan Industrial Facilities

Client:Al Fara’a / ADNOC Gas Processing
Location:Habshan
Year:2010
Type:MEP
Project Habshan

  Scope of Work

  • Complete MEP works for 16 buildings of industrial facilities (design, detailed engineering, testing, installation, and commissioning).
  • Electrical distribution network – 11kV substation (total 15MVA) with 11kV switchgears, transformers, LV switchgears, and bust ducts.
  • Complete building electrification.
  • Electrical control system, UPS, and fibre optic backbone.
  • Telecom system including voice and data system, PA system, access card reader system, and CCTV system.
  • HVAC.
  • Fire alarm and fire fighting systems.
View Reference List View Reference Projects