Client: | Al Fara’a / ADNOC Gas Processing |
---|---|
Location: | Bu Hasa |
Year: | 2011 |
Type: | MEP |
Scope of Work
- Complete MEP works for 4 buildings of the new management, and auditorium building, design, detailed engineering, testing, installation, and commissioning.
- Electrical works – design, engineering, procurement, construction, installation, and commissioning (including protection study) of:
- Electrical distribution network – 11kV substation (Total 5 MVA).
- 2 nos. 11/.415kV transformer.
- LV panels, cast resin bus ducts, central battery system, and intelligent lighting control system.
- Load transfer from existing substation to new substation.
- V&D system, HVAC, and fire fighting works.