Client: | ADNOC Refining (TAKREER) |
---|---|
Location: | Ruwais |
Year: | 2011 |
Type: | EPC |
Scope of Work
- Engineering, procurement, construction, pre-commissioning, and commissioning works.
- Replacement of PSA unit control system by providing new Modicon PLC procured through our subcontractor UOP.
- PSA unit piping modification works.
- Replace of old butterfly valves (10 nos.) in PSA unit.
- DCS interface works.