Skip to content
Client: | Etisalat |
Location: | Dubai |
Year: | 2018 |
Type: | EPC |
Scope of Work
- Upgrade of existing data center building to ground floor and first floor.
- Supply and installation of transformer 11/0.415kV, 1500kVA – 1 no.
- Supply and installation of containerized diesel generator 1500kVA along with fuel system – 1 no.
- Supply and installation of MDB, SMDB and final DB.
- Supply and installation of CCUs (88 kW and 35 kW).
- Supply and installation of fire fighting system and ELV systems works.
- Supply and installation of DC SMDB and PDBs.
- Supply and installation of LV power, control, and earthing cables.