Client: | ADNOC Offshore (ADMA-OPCO) |
---|---|
Location: | ZWSC & ZCSC |
Year: | 2015 |
Type: | EPC |

Scope of Work
- Replacement of 42 415V switchgears
- Supply and installation of two 11kV/415V and 2 MVA dry type transformers.
- Engineering studies such as load flow, short circuit, relay coordination using ETAP Software.
- Replacement of 42 nos. LV switchgears on existing footprint after removing existing switchgears, 11kV/415V, 2 MVA dry type transformers, 11kV switchgear modification in ZWAP, power and control cables (11kV and LV).
- Provided temporary LV switchgears and cables during the 42 nos. LV switchgear replacement.
- Integrated protection, control and monitoring system for LV switchgears.