Replacement of Obsolete 11kV Switchgear

Client:ADNOC Gas Processing (GASCO)
Location:Bu Hasa
Year:2012
Type:EPC

  Scope of Work

  • Engineering, procurement, construction, and commissioning.
  • 33/11kV power transformers, 11kV switchgear, and shifting 3.3kV camp feeders to 11kV network.
  • Existing 33KV switchgear modifications.
  • Modifications to existing SCMS, PMS, and DCS.
  • NER, NE transformer, and RTCC panel.
  • Construction of substation buildings and necessary cable trenches.
  • Pre-commissioning, commissioning, training, and handover.