Client: | ADNOC Offshore |
---|---|
Location: | Upper Zakum Field, Abu Dhabi |
Year: | 2020 |
Type: | EPC |
Scope of Work
- The scope of work involves replacement of existing Hydril RTUs on 14 WHPTs with Honeywell Control Edge RTU and Hot Changeover of signals from old RTU to new RTU.
- These new RTUs shall be interfaced to the existing Honeywell Experion MTU through existing telecommunication hardware and software setup.