Client: | ADNOC Fertilizers (FERTIL) |
---|---|
Location: | Ruwais |
Year: | 2012 |
Type: | EPC |
Scope of Work
- Upgrade of anti-surge control system and local controllers.
- Replacement of 750kVA (TRL50-03) transformer in utility substation.
- Replacement of AC and DC UPS systems.
- Connection of new MOV’s at ammonia and utility plant.
- Shifting of X8003 and X8004 cables from granulation to urea substation.
- Replacement of P-1302A and B LCS control cables<./li>