| Client: | Emirates Steel |
|---|---|
| Location: | Mussafah |
| Year: | 2018 |
| Type: | EPC |
Scope of Work
- Supply and installation of 1 no. of package substation.
- Supply and installation of LV and MV power cables.
- Supply and installation of cable terminations.
- Supply and installation of cable trays and bulk materials.